Mettur is a power and chemicals town built around the dam on the Kaveri, and it has an unusual relationship with electricity - it generates a great deal of it and consumes a great deal of it. For industrial consumers here the question is rarely whether power is available but what it costs per unit during daytime operations, which is the gap rooftop solar closes.
Yield figures are regional averages from published irradiance data, quoted as indicative ranges. What a particular roof produces depends on its orientation, shading and the equipment specified — which is what the site survey establishes.
The chemical and alloy units around Mettur carry continuous process loads, and many run beyond daylight hours, which changes the sizing maths: a rooftop array covers the daytime portion of a round-the-clock demand rather than the whole of it. That is still worth doing, but it means the honest conversation is about what share of the bill solar addresses, not about eliminating it. Roof areas on these plants are generally large, which helps.
Process plants around Mettur often have roofs with existing service runs, vents and extraction stacks competing for space, so the usable area is usually well below the gross roof area - the survey here is as much about obstruction mapping as about structure. Where the roof cannot take a useful array, the open land many of these sites hold makes a ground-mount the better answer.
At Mettur’s average yield, a 3 kW rooftop system — the size the PM Surya Ghar subsidy caps at — generates roughly 12.9 units on an average day and about 4,700 units a year. Residential rooftops of 3 kW and above qualify for the central subsidy of up to ₹78,000, subject to eligibility under the scheme, and Tamil Nadu announced a further top-up in September 2026 — our solar subsidy guide sets out what each one pays and how firm the state figure is.
Net metering is handled through Mettur section, Mettur circle. We prepare and file that application as part of the installation; sanction typically takes 60 to 120 days from submission. Our net metering guide explains which arrangement you would be on and why it decides the size worth installing.
It addresses the daytime share of your load, not all of it, so the saving is proportionally smaller than for a day-shift operation - but the units it does displace are real. We would model it against your actual consumption pattern rather than quote a headline percentage.
Often partly. The usable area on a process roof is typically much less than the total, and mapping that honestly is the first thing the survey does. If the roof cannot carry a worthwhile array, open land on the site is usually the better option.
Mettur falls under the Mettur distribution circle rather than Salem circle. We file the net-metering application with the relevant section office as part of the project.
VENAARC installs across Mettur, Salem district from our base in Sankagiri. Listing an area means we travel there and work there — it is not a claim that a plant has been built in every town named on this site.
The survey is free and there is no quote until someone has seen the roof. Call +91 7871631474 or send the details and we will come out to you.