Terrain Feasibility
High-precision GPS GIS mapping, DNI solar irradiance modeling, and soil resistivity studies.

Turnkey ground-mounted solar farm engineering, Group Captive Open Access, high-voltage 33kV/110kV grid evacuation, and 25-year asset stewardship across Tamil Nadu and South India.
Textiles, foundries, steel mills, and cement plants with HT power connections above 500 kVA seeking OPEX reduction via Group Captive.
Large-scale production facilities, cold chain operators, and warehousing hubs needing predictable, low-cost power for 24×7 operations.
Companies with RE100, Science Based Targets, or global supply chain sustainability mandates requiring verified renewable energy certificates.
Infrastructure funds, family offices, and independent power producers seeking bankable solar assets with long-term, index-linked returns.
Holders of 10–500+ acres of barren or non-agricultural land in Tamil Nadu looking to monetize idle land with contracted 25–30 year lease income.
Utility developers and co-development partners requiring turnkey engineering, grid connectivity, CEIG approvals, and O&M for solar parks above 5 MW.
Plant Construction Period > 6 Months
18 Months Free of Cost Maintenance
5 Years Defect Liability
Turn-Key O & M Services
Lifetime Support
TIER 1 Components
Energy Commitments
Modern utility solar parks using high-wattage (600Wp+) bifacial N-type TOPCon modules on single-axis trackers typically require between 3.5 to 4.0 acres per Megawatt (MW). This footprint comfortably accommodates module strings, inter-row pitch clearances, in-plant roads, inverter stations, water cleaning storage, and the boundary safety fence.