Attur sits in the east of Salem district on the road to Trichy, in a valley that grows and processes tapioca on a scale found almost nowhere else. The sago industry here is the reason the town has an industrial load at all, and it is an unusually good match for solar because the process that consumes the power is the same one that needs the sun.
Yield figures are regional averages from published irradiance data, quoted as indicative ranges. What a particular roof produces depends on its orientation, shading and the equipment specified — which is what the site survey establishes.
Sago and starch making is Attur's defining trade. Tapioca arrives from the surrounding farms and is washed, crushed, settled and dried, and the drying is traditionally done on open yards in daylight — a process already organised around the sun. The electrical load is in the washing, crushing and pumping that precedes it, concentrated in daytime hours. Paddy and groundnut processing add to the pattern. Because so much of the physical plant is open yard rather than enclosed building, the roof area available for an array is often smaller than the size of the operation would suggest.
Sago units typically have a modest machinery shed and a great deal of open drying yard, which inverts the usual calculation: the obvious surface is the one that must stay clear, because it is where the product dries. Mounting over a drying yard is not an option. What is left is the shed roof, usually sheet on light truss, plus whatever ancillary buildings exist. Where the load justifies more than the sheds can carry, a ground-mount on land not used for drying is the realistic alternative, and the survey is largely about finding that space.
At Attur’s average yield, a 3 kW rooftop system — the size the PM Surya Ghar subsidy caps at — generates roughly 12.8 units on an average day and about 4,680 units a year. Residential rooftops of 3 kW and above qualify for the central subsidy of up to ₹78,000, subject to eligibility under the scheme, and Tamil Nadu announced a further top-up in September 2026 — our solar subsidy guide sets out what each one pays and how firm the state figure is.
Net metering is handled through Attur section, Salem circle. We prepare and file that application as part of the installation; sanction typically takes 60 to 120 days from submission. Our net metering guide explains which arrangement you would be on and why it decides the size worth installing.
No — the yard needs the sunlight, and shading it would slow the drying that the whole operation depends on. The array goes on sheds and ancillary buildings, or on ground that is not used for drying. It is the one site type where the largest flat surface is the one we will not use.
Either a partial system sized to what the sheds carry, which still pays back on the units it displaces, or a ground-mount on spare land. Which is better depends on how much land you have and what it is worth to you — the survey compares both rather than assuming.
It settles and reduces output, and because it is fine and sticky when damp it needs a shorter cleaning interval than road dust would. Positioning the array away from the crushing and washing area reduces how fast it builds.
VENAARC installs across Attur, Salem district from our base in Sankagiri. Listing an area means we travel there and work there — it is not a claim that a plant has been built in every town named on this site.
The survey is free and there is no quote until someone has seen the roof. Call +91 7871631474 or send the details and we will come out to you.